bioecon Member area
Regulation · Route into Russia / EAEU

SERV · — (operator: Rosprirodnadzor, Rostechnadzor)

Ease 3/3 none for the service; operator permits (integrated environmental permit ~1 month)verified 2026-10-06

Information, not legal advice — confirm the procedure for your product.

Legal basis

No product registration; operators of category I facilities need an integrated environmental permit (Federal Law 7-FZ Art. 31.1) and, where relevant, Rostechnadzor licences

Mining biotech, remediation, wastewater, consulting, licensing.

Official-source check

Regulator
Rosprirodnadzor (for environmental permits) and Rostechnadzor (for hazardous facility licenses).
Legal basis
Federal Law No. 7-FZ "On Environmental Protection" (Article 31.1); Government Decree No. 143 of 13.02.2019; Rostechnadzor Order No. 454 of 25.11.2020.
Typical time
25 calendar days to 1 month for KЭP processing.
Corrections
The draft is correct that there is no product registration for these services. However, it is incomplete regarding the regulatory requirements for the operator. Companies operating facilities that have a negative impact on the environment (Category I) must obtain a Comprehensive Environmental Permit (KЭP). Additionally, specific activities may require licenses (e.g., for hazardous production facilities).
Operators of facilities with a negative impact on the environment (Category I) must obtain a Comprehensive Environmental Permit (KЭP).
“Разрешение выдается юридическому лицу или индивидуальному предпринимателю, осуществляющим хозяйственную и (или) иную деятельность на объектах, оказывающих негативное воздействие на окружающую среду и относящихся к объектам I категории, на отдельный объект, оказывающий негативное воздействие на …”
pravo.ppt.ru
The territorial body of Rosprirodnadzor issues the permit within 25 calendar days after accepting the application, but no later than one month from the date of receipt.
“Территориальный орган Федеральной службы по надзору в сфере природопользования в течение 25 календарных дней после приема к рассмотрению заявки на получение разрешения, но не позднее чем в месячный срок со дня получения указанной заявки, выдает заявителю разрешение...”
pravo.ppt.ru
Licensing is required for the operation of hazardous production facilities of I, II, and III hazard classes.
“Об утверждении Административного регламента Федеральной службы по экологическому, технологическому и атомному надзору по предоставлению государственной услуги по лицензированию эксплуатации взрывопожароопасных и химически опасных производственных объектов I, II и III классов опасности”
official www.consultant.ru

Catalogue categories that need this route

Solutions on this route 22

D3E2Sugarcane and palm-oil mill residues — vinasse, filter cake (press mud), bagasse, palm oil mill effluent (POME) and empty fruit bunches (EFB) — anaerobically digested, composted and returned to the field instead of raw discharge, open anaerobic lagoons, burning and mineral fertilizer
D2E–Grafting onto resistant rootstocks, biological/anaerobic soil disinfestation and biofumigation, and soilless (substrate and hydroponic) culture instead of methyl bromide and chemical soil fumigants
D1E–Oil and petroleum-product pollution clean-up by bioremediation — nutrient biostimulation, oil-degrading microbial preparations, landfarming/biopiles and phytoremediation — instead of chemical dispersants, burning and landfilling
D1E4Constructed (treatment) wetlands for villages, farms, small towns and stormwater — instead of chemical precipitation, chlorination of effluent, or discharge of untreated wastewater
D1E2Lake and pond algal-bloom (cyanobacteria) control by nutrient reduction, biomanipulation (fish-stock management, zooplankton), submerged-plant restoration and floating wetlands — instead of copper sulfate and chemical algicides
D1E–Fish louse (Argulus) control in ponds and lakes with egg-laying substrate boards, pond drying/liming and biological management — instead of organophosphate treatments
D2E–Oil-reservoir and pipeline souring (H2S) control by nitrate injection (biocompetitive exclusion by nitrate-reducing bacteria) — instead of continuous biocide dosing
D1E–Manure methane, ammonia and odour cut by anaerobic digestion with covered storage, low-protein diets balanced with fermentation amino acids, and biological air treatment of livestock houses — instead of open lagoons, sulfuric-acid slurry acidification and masking agents
D2E–Refractory gold ore processing by bacterial biooxidation (BIOX® and similar tank bioleaching) — instead of roasting; with biological cyanide destruction of tailings water
D2E4Copper (and nickel/cobalt) recovery from low-grade and secondary sulfide ores by heap and dump bioleaching + SX-EW — instead of concentration and smelting
D1E3Acid mine drainage and metal-rich mine water treatment with passive biological systems — sulfate-reducing bioreactors, compost wetlands, aerobic wetlands — instead of perpetual lime dosing
D2E–Petroleum-contaminated soil and drill cuttings cleaned by bioremediation (landfarming, biopiles, bioaugmentation, biostimulation) instead of excavation to landfill, incineration/thermal desorption and chemical oxidation
D1E–Metal-contaminated soils, mine tailings and smelter sites managed by phytostabilization, phytoextraction and rhizoremediation (gentle remediation options) instead of excavation, soil washing and inert capping
D1E–Farm nitrate and phosphate runoff controlled by biology — denitrifying bioreactors, wetlands and algal uptake — instead of end-of-pipe chemical dosing
D0E–Oilfield produced water treated biologically instead of chemical-only conditioning and disposal
D2E–Enhanced biological phosphorus removal instead of chemical precipitation with metal salts
D1E4Food and market organic waste treated by black soldier fly (BSF) larvae, composting and bokashi fermentation instead of landfilling, open dumping and incineration of wet waste
D3E–Sewage sludge and faecal sludge stabilized biologically — anaerobic digestion, thermophilic co-composting, sludge treatment (drying) reed beds — instead of lime stabilization, landfilling, incineration-only and raw dumping
D2E–Composting and anaerobic digestion of separately collected biowaste instead of landfill