bioecon Member area
Regulation · Route into Russia / EAEU

WATER · Rospotrebnadzor

Ease 3/3 SGR within 30 calendar days (in practice ~6-12 weeks with tests)verified 2026-10-06

Information, not legal advice — confirm the procedure for your product.

Legal basis

CU Commission Decision No. 299 (28.05.2010): SGR for reagents used in drinking-water treatment; industrial uses mostly none

Bio-coagulants, enzyme and phage biofilm control.

Official-source check

Regulator
Rospotrebnadzor
Legal basis
Decision of the Commission of the Customs Union No. 299 dated May 28, 2010
Typical time
Official maximum is 30 calendar days; practical duration is typically 6-12 weeks including laboratory testing.
Corrections
The draft correctly identifies Rospotrebnadzor and the SGR requirement for water treatment reagents. However, the typical duration is generally shorter than 1 year (often 8-12 weeks for drinking water applications), and the SGR is issued indefinitely, not for a limited period. Additionally, the requirement applies to reagents used in drinking water systems, not just those for 'drinking water' itself.
The competent authority for state registration is the authorized body of the EAEU member state in the field of sanitary-epidemiological welfare, which is Rospotrebnadzor in Russia.
“Свидетельство оформляется уполномоченным органом государства – члена Евразийского экономического союза в области санитарно-эпидемиологического благополучия населения (далее соответственно – уполномоченный орган, государство-член) по единой форме, утвержденной Решением Комиссии Таможенного союза от …”
official regulation.eaeunion.org
The legal basis for the state registration of reagents added to water is the Decision of the Commission of the Customs Union No. 299.
“Решение Комиссии Таможенного союза от 28.05.2010 N 299 (ред. от 02.06.2026) "О применении санитарных мер в Евразийском экономическом союзе"”
official www.consultant.ru
The official maximum duration for the issuance of the SGR is 30 calendar days from the date of application.
“Срок оформления свидетельства не может превышать 30 календарных дней с даты обращения заявителя.”
official regulation.eaeunion.org
Typical practical timelines for obtaining an SGR for water treatment reagents range from 6 to 12 weeks, depending on the specific application (e.g., drinking water vs. industrial).
“Питьевой контур, ВЗУ ... 8-12 недель; Котельная, теплосеть ... 6-10 недель; Промстоки без питьевого контакта ... 6-8 недель”
scpartner.ru

Sources

https://regulation.eaeunion.org/upload/iblock/6a3/hudkayl4qr82s4w6pb96eyxx0sn1fe3s/ria_04062015_att.pdf
https://www.consultant.ru/document/cons_doc_LAW_101851/d220b4ae429b3b5549f3001470ddf998169eebb2/
https://scpartner.ru/sgr-na-vodopodgotovku/

Solutions on this route 2