Biomass co-firing retrofits (coal-power units)
Coupling biomass generation with a coal unit so that it can co-fire 10 % or more biomass — over 150 commercial projects abroad, Chinese pilots since 2018, and NTPC's 20 % torrefied-biomass demonstration in India in 2024.
1 · What it gives
Biomass co-firing retrofit couples biomass generation with a coal power unit so that, after retrofit, the unit can co-fire 10 % or more biomass. More than 150 commercial co-firing projects operate internationally, mainly in developed countries. In China pilot retrofit projects were announced in 2018; in India NTPC reported in 2024 a successful demonstration of co-firing 20 wt.% torrefied biomass at Tanda Unit 4.
2 · What it replaces 6
3 · How to implement 3 steps
- 1Site and fuel supplyChoose a suitable site and secure long-term, stable biomass supply.
- 2Retrofit the unitRetrofit the coal unit to co-fire biomass at the target share.
- 3Account and reportSet up carbon and electricity accounting for the biomass share.
4 · Who delivers
Matched suppliers (matched automatically)
| Kobelco Eco-Solutions Vietnam Co.,Ltd. | Vietnam | Services / consulting | active |
| True Eco Sdn Bhd | Malaysia | Distributor | active |
| Prometheus Materials | United States | Research / RTO | active |
| Alveo Water (Pty) Ltd | South Africa | Services / consulting | active |
| BM GreenTech Berhad | Malaysia | Research / RTO | active |
| GPS Renewables | India | Research / RTO | active |
| Kobelco Eco-Solutions Co., Ltd. | Japan | Research / RTO | active |
| MENA-Water | United Arab Emirates | Producer | active |
| Pyrogreen Energy | China | Producer | active |
| Aemetis | United States | Producer | active |
| Gevo | United States | Producer | active |
| LanzaTech | United States | Producer | active |
Leading companies and institutes (from the brief)
NTPC (India) provides biomass co-firing in existing and new coal plants. Others are matched by the portal under Energy and Advanced biofuels.
5 · Rules & route to market
declaration of conformity (testing extra)
Information, not legal advice — confirm the procedure for your product. (2026-10-06)
United States
The sources reviewed on 2026-10-16 identified no the US regulator or standard specific to this technology. Treat the route as case-by-case and ask for a check.
European Union
The sources reviewed on 2026-10-16 identified no the EU regulator or standard specific to this technology. Treat the route as case-by-case and ask for a check.
China
In China the Coal Power Low-Carbon Retrofit Action Plan (2024–2027) sets requirements for biomass co-firing, project layout and carbon reduction. Co-firing is not covered by existing biomass electricity tariff subsidies, and standards for accounting the electricity are needed.
6 · Money: tenders & grants
No open tender or grant matched right now.
7 · Tech stack & innovations
Main risks from the sources: intensified air pollution and health risks (one study projects higher SO2, PM2.5 and NOx), slow progress from project economics and high fuel cost, and subsidy and accounting gaps.
Sources 5
- Gov.cn — www.gov.cn 2026-10-16
- Ntpc.co.in — ntpc.co.in 2026-10-16
- Ccn.ac.cn — www.ccn.ac.cn 2026-10-16
- Discovery.ucl.ac.uk — discovery.ucl.ac.uk 2026-10-16
- Pubs.acs.org — pubs.acs.org 2026-10-16